Browse Items (19 total)

new windows.jpg
New Windows installed at the GAHC

DSCN1929.JPG
Workers put the finishing touches on the roof edging.

GAHC-construction2007 072.jpg
Upper floor takes shape as part of renovation project. It can be seen where walls once stood in the building's prior life as the Miller's or Standard Hotel.

Second floor by bathroom-2004-5.jpg
A view of the construction that was occurring on the second floor during 2004.

building display in first floor.jpg
Walls being dry walled in the first floor exhibit hall.

grant for historic storefront replacement.jpg
State Historical Society of Iowa presenting the GAHC with a grant to help pay for the restoration of the storefront of the building.

pouring fill, old storefronts.jpg
Concrete worker prepares to pour fill into the basement. This fill closes off the basement, stabilizes the basement, and helps prevent water issues.

interior 98.jpg
Interior view of the GAHC building. Iron pipe removal is occurring to modernize the plumbing.

Harlan Meier right 98.jpg
Harlan Meier (right) and man saw OSB board for renovation to the GAHC building.

Don Welzenbach working on sewer-summer 1998.jpg
Don Welzenbach working on the sewer system of the GAHC in the summer of 1998.
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2